The installation consists of 173 Railpucks, two power supply pits and eight sensors distributed along the route. The Railpucks are mounted directly in the web of the rail, keeping the system compact and the space alongside the track clear.
Installation is designed around railway practice. No heavy equipment is required and the system can be installed without de-energising the rail.